- 1. How long is the Trans-Alaska Pipeline System in miles?
A) 600 B) 1200 C) 800 D) 1000
- 2. Which mountain range does the pipeline traverse in Alaska?
A) Cascade Range B) Rocky Mountains C) Sierra Nevada D) Brooks Range
- 3. What is the destination of the oil transported by the Trans-Alaska Pipeline System?
A) Juneau B) Anchorage C) Valdez D) Fairbanks
- 4. What was the estimated cost of constructing the Trans-Alaska Pipeline System?
A) $15 billion B) $5 billion C) $10 billion D) $8 billion
- 5. What year did the Trans-Alaska Pipeline System become operational?
A) 1995 B) 1970 C) 1985 D) 1977
- 6. Where does the Trans-Alaska Pipeline System begin?
A) Juneau B) Anchorage C) Prudhoe Bay D) Fairbanks
- 7. What was the primary method of transporting construction materials to remote locations along the pipeline route?
A) Ships B) Helicopters C) Trains D) Trucks
- 8. Which city was the headquarters for the construction of the Trans-Alaska Pipeline System?
A) Juneau B) Valdez C) Fairbanks D) Anchorage
- 9. When did construction of the Trans-Alaska Pipeline System begin?
A) 1968 B) 1974 C) 1990 D) 1982
- 10. Which company was primarily responsible for building the Trans-Alaska Pipeline System?
A) Alyeska Pipeline Service Company B) ExxonMobil C) Shell D) Chevron
- 11. Which indigenous group raised environmental concerns about the construction of the Trans-Alaska Pipeline System?
A) Inuit B) Gwich'in C) Aleut D) Tlingit
- 12. How many pump stations are there along the Trans-Alaska Pipeline System?
A) 11 B) 5 C) 15 D) 20
- 13. What is the diameter of the pipes used in the Trans-Alaska Pipeline System?
A) 60 inches B) 36 inches C) 48 inches D) 24 inches
- 14. Which US President signed the authorizing legislation for the construction of the Trans-Alaska Pipeline System?
A) Jimmy Carter B) Richard Nixon C) Gerald Ford D) Ronald Reagan
- 15. How long did it take to complete the construction of the Trans-Alaska Pipeline System?
A) 5 years B) 3 years C) 10 years D) 1 year
|