- 1. How long is the Trans-Alaska Pipeline System in miles?
A) 1000 B) 800 C) 600 D) 1200
- 2. Which mountain range does the pipeline traverse in Alaska?
A) Brooks Range B) Rocky Mountains C) Cascade Range D) Sierra Nevada
- 3. What is the destination of the oil transported by the Trans-Alaska Pipeline System?
A) Valdez B) Fairbanks C) Juneau D) Anchorage
- 4. What was the estimated cost of constructing the Trans-Alaska Pipeline System?
A) $8 billion B) $5 billion C) $10 billion D) $15 billion
- 5. What year did the Trans-Alaska Pipeline System become operational?
A) 1985 B) 1970 C) 1995 D) 1977
- 6. Where does the Trans-Alaska Pipeline System begin?
A) Juneau B) Prudhoe Bay C) Anchorage D) Fairbanks
- 7. What was the primary method of transporting construction materials to remote locations along the pipeline route?
A) Trains B) Trucks C) Helicopters D) Ships
- 8. Which city was the headquarters for the construction of the Trans-Alaska Pipeline System?
A) Fairbanks B) Juneau C) Anchorage D) Valdez
- 9. When did construction of the Trans-Alaska Pipeline System begin?
A) 1974 B) 1968 C) 1982 D) 1990
- 10. Which company was primarily responsible for building the Trans-Alaska Pipeline System?
A) Shell B) Chevron C) ExxonMobil D) Alyeska Pipeline Service Company
- 11. Which indigenous group raised environmental concerns about the construction of the Trans-Alaska Pipeline System?
A) Tlingit B) Aleut C) Inuit D) Gwich'in
- 12. How many pump stations are there along the Trans-Alaska Pipeline System?
A) 15 B) 5 C) 11 D) 20
- 13. What is the diameter of the pipes used in the Trans-Alaska Pipeline System?
A) 36 inches B) 60 inches C) 24 inches D) 48 inches
- 14. Which US President signed the authorizing legislation for the construction of the Trans-Alaska Pipeline System?
A) Ronald Reagan B) Richard Nixon C) Gerald Ford D) Jimmy Carter
- 15. How long did it take to complete the construction of the Trans-Alaska Pipeline System?
A) 10 years B) 5 years C) 3 years D) 1 year
|