Kuala Lumpur Sentral station - Quiz
Kuala Lumpur Sentral station
  • 1. Which service provides non-stop express trains to KLIA T1 and T2?
A) KLIA Transit
B) KLIA Ekspres
C) Rapid KL
D) KTM Komuter
  • 2. What is the IATA code assigned to KL City Air Terminal?
A) XKL
B) KLA
C) KLM
D) KUL
  • 3. When did the KL City Air Terminal open?
A) 14 April 2010
B) 14 October 2002
C) 14 April 2005
D) 14 April 2002
  • 4. Which airline passengers can currently check in their baggage at KL CAT?
A) Emirates and Qatar Airways
B) AirAsia and Firefly
C) Malindo Air and Singapore Airlines
D) Malaysia Airlines and Batik Air
  • 5. Where is the KL CAT Departure Hall located?
A) At the underground level
B) At the western end of the station
C) At the eastern end of the station
D) At the rooftop level
  • 6. Which MRT line connects to the KL CAT Arrival Hall via a linkway?
A) MRT Kajang Line
B) MRT Shah Alam Line
C) MRT Putrajaya Line
D) MRT Circle Line
  • 7. Which KTM Komuter line serves Batu Caves?
A) KTM ETS Line
B) KL Sentral–Terminal Skypark Line
C) Batu Caves–Pulau Sebang Line
D) Tanjung Malim–Port Klang Line
  • 8. What is the current status of the KL Sentral–Terminal Skypark Line?
A) Fully operational
B) Under maintenance
C) Newly opened
D) Suspended
  • 9. What is the brand name of the Kelana Jaya Line station at KL Sentral?
A) KL Sentral-redONE
B) KL Sentral-City
C) KL Sentral-Rapid
D) KL Sentral-LRT
  • 10. Where is the KL CAT Arrival Hall located?
A) At the eastern end of the station
B) In the center of the building
C) At the mezzanine level
D) At the western end of the station
  • 11. Which of the following stations is a stop on the KLIA Transit line?
A) Ipoh
B) Padang Besar
C) Subang Jaya
D) Salak Tinggi
  • 12. Which train service is known as an excursion train for 'Rail To See Malaysia'?
A) Kelana Jaya Line
B) KTM Intercity
C) KTM ETS
D) KLIA Ekspres
  • 13. Has the planned through checked baggage service from KLIA to KL CAT been implemented?
A) No
B) Yes
C) Yes, but only for domestic flights
D) Yes, but only for international flights
  • 14. Which destination is served by the KTM ETS service?
A) Terminal Skypark
B) Port Klang
C) Padang Besar
D) Batu Caves
  • 15. What does the KLIA Transit offer compared to the KLIA Ekspres?
A) Long-distance intercity service
B) Non-stop luxury service
C) Freight-only service
D) Commuter-style service with stops in between
  • 16. What is the proposed use for Lot B in KL Sentral?
A) A transportation depot
B) A residential block
C) An entertainment hub
D) A financial area
  • 17. Which lot is planned for a future office block?
A) Lot E
B) Lot F
C) Lot H
D) Lot B
  • 18. What is the name of the shopping mall located in Lot G?
A) Sentral Plaza
B) NU Sentral
C) Stesen Sentral
D) KL Sentral Mall
  • 19. In which direction is Lot G located within KL Sentral?
A) South
B) West
C) North
D) East
  • 20. When were development works for NU Sentral completed?
A) 2020
B) 2014
C) 2008
D) 2001
  • 21. How long is the lease held by Jewel Surprises Sdn Bhd for Lot G?
A) 999 years
B) 50 years
C) 30 years
D) 99 years
  • 22. What is the official name of Lot H?
A) Sentral Terminal
B) NU Sentral
C) Stesen Sentral
D) KL Sentral Hub
  • 23. In what year were the rail, retail, and F&B operations at Stesen Sentral started?
A) 2001
B) 2014
C) 2008
D) 2000
  • 24. How many rail networks was Stesen Sentral designed to house?
A) Ten
B) Four
C) Eight
D) Six
  • 25. What was the daily passenger count for Stesen Sentral in 2008?
A) Over 1 million
B) Over 100,000
C) Over 500,000
D) Over 50,000
  • 26. What was the size of the main building of Stesen Sentral in square feet?
A) 600,000
B) 500,000
C) 546,000
D) 1,200,000
  • 27. How many blocks were included in Phase I of Plaza Sentral?
A) Five blocks
B) Four blocks
C) Three blocks
D) Two blocks
  • 28. When was Phase II of Plaza Sentral launched?
A) June 2001
B) May 2005
C) September 2003
D) March 2004
  • 29. In what year was Phase II of Plaza Sentral completed?
A) 2001
B) 2004
C) 2006
D) 2007
  • 30. How many towers are in Phase II of Plaza Sentral?
A) Three towers
B) Five towers
C) Four towers
D) Two towers
  • 31. Which company is listed as a tenant in Phase II of Plaza Sentral?
A) MRCB
B) British Telecom
C) General Electric
D) PricewaterhouseCoopers
  • 32. Who bought the Sentral Tower in March 2004?
A) Lembaga Tabung Haji
B) Maxis Communications
C) Quill Realty Sdn Bhd
D) United Engineers (M) Bhd
  • 33. How many storeys tall is the Sentral Tower?
A) 26-storey
B) 35-storey
C) 30-storey
D) 18-storey
  • 34. How many storeys tall are the office towers in Lot J?
A) 30-storey
B) 35-storey
C) 26-storey
D) 18-storey
  • 35. Who purchased Lot J in May 2005?
A) Quill Realty Sdn Bhd
B) MRCB
C) Lembaga Tabung Haji
D) United Engineers (M) Bhd
  • 36. What is the name of the corporate headquarters for UEM located on Lot J?
A) 1 Sentral Tower
B) Mercu UEM
C) Plaza Sentral
D) Quill 7
  • 37. Which company is Tower B in Lot J intended for?
A) PricewaterhouseCoopers
B) Malaysian Industrial Development Authority
C) British Telecom
D) General Electric
  • 38. What is the name of the office building in Lot J built by Quill?
A) Plaza Sentral
B) 1 Sentral Tower
C) Mercu UEM
D) Quill 7
  • 39. When did Sooka Sentral open?
A) June 2001
B) December 2007
C) September 2003
D) 2006
  • 40. How many storeys is the lifestyle centre called Sooka Sentral?
A) 18-storey
B) Six-storey
C) 26-storey
D) 30-storey
  • 41. In what year was the construction of 1 Sentral Tower completed?
A) 2006
B) 2007
C) 2001
D) 2003
  • 42. Which company is a tenant in 1 Sentral Tower?
A) Maxis Communications
B) British Telecom
C) Malaysian Industrial Development Authority
D) PricewaterhouseCoopers
  • 43. What percentage of the total land area in KL Sentral is occupied by office zones?
A) Exactly 40%
B) Exactly 75%
C) Less than 25%
D) More than 50%
  • 44. When was all construction in the KL Sentral development area scheduled to be completed?
A) 2015
B) 2020
C) 2008
D) 2011
  • 45. What is the name of the tower serving as the CIMB Headquarters?
A) Menara CIMB
B) CIMB Centre
C) CIMB Financial Hub
D) CIMB Plaza
  • 46. The CIMB Headquarters building faces which landmark?
A) KL Tower
B) Merdeka Square
C) Petronas Towers
D) National Museum
  • 47. When did CIMB Group acquire the land for Lot A?
A) July 2007
B) December 2005
C) July 2008
D) June 2011
  • 48. In what year was the construction of Menara CIMB completed?
A) 2008
B) 2007
C) 2011
D) 2015
  • 49. Which station replaced KL Sentral as the largest railway station in Southeast Asia in 2021?
A) Johor Bahru Sentral
B) Kuala Lumpur International Airport
C) Krung Thep Aphiwat Central Terminal
D) Butterworth Central Station
  • 50. Who was the architect responsible for designing the master plan of KL Sentral?
A) Prasarana Integrated Development
B) Malaysian Resources Corporation Berhad
C) Lim Zhengyan
D) Kisho Kurokawa
  • 51. In what year were the Japanese language signs removed from KL Sentral?
A) 2015
B) 2025
C) 2019
D) 2001
  • 52. The bomb threats in 2019 were posted by a hacked account owned by whom?
A) Prasarana
B) MRCB
C) Kisho Kurokawa
D) limzhengyan
  • 53. In what year did the Allies bomb the marshalling yard where KL Sentral now stands?
A) 1994
B) 1945
C) 2010
D) 2001
  • 54. Where is the KL Sentral Monorail station located?
A) Jalan Tun Sambanthan
B) Jalan Ampang
C) Jalan Damansara
D) Jalan Bukit Bintang
  • 55. How long is the underground walkway connecting KL Sentral to Muzium Negara station?
A) 200 metres
B) 100 metres
C) 500 metres
D) 1 kilometre
  • 56. What is the platform configuration used by the KL Sentral monorail station?
A) Island platform
B) Side platform
C) Terminal bay
D) Spanish solution
  • 57. What feature is provided at the monorail station for the visually impaired?
A) Guided handrails
B) Audio announcements
C) Braille maps
D) Tactile paving
  • 58. How did passengers reach Stesen Sentral from the monorail station before NU Sentral was built?
A) Via a skybridge
B) Via a dedicated shuttle bus
C) By walking through Jalan Tun Sambanthan
D) Via an underground tunnel
  • 59. What is the status of the KL Sentral monorail station on the KL Monorail line?
A) It is a transfer hub only
B) It is an intermediate station
C) It is an under-construction station
D) It is a terminus
  • 60. What connects the Muzium Negara MRT station to the main KL Sentral building?
A) A city shuttle bus
B) An overhead monorail
C) A dedicated elevator
D) An underground footbridge
  • 61. Which bus route is only available during meeting sessions at the Parliament of Malaysia?
A) T819
B) T851
C) 800
D) 500
  • 62. In which year did the St. Regis Hotel Kuala Lumpur start its operation?
A) 2017
B) 2016
C) 2015
D) 2014
  • 63. How many rooms and suites does the St. Regis Hotel Kuala Lumpur consist of?
A) 208
B) 55
C) 600
D) 400
  • 64. How many storeys are the residential towers at The Sentral Residences?
A) 37-storey
B) 55-storey
C) 40-storey
D) 38-storey
  • 65. What is the total number of apartment units in Suasana Sentral?
A) 600
B) 55
C) 208
D) 400
  • 66. What percentage of buyers in Suasana Sentral come from the international community?
A) 60%
B) 20%
C) 40%
D) 50%
  • 67. How many units are in the Suasana Sentral Loft towers?
A) 1000
B) 600
C) 400
D) 208
  • 68. Which bus route connects Port Klang to Pasar Seni via KL Sentral?
A) 782
B) 770
C) 641
D) 710
  • 69. Which bus route connects Taman OUG to Pasar Seni via Awan Besar LRT station?
A) 650
B) 652
C) 651
D) 641
  • 70. Which development is located on Lot C of KL Sentral?
A) The Sentral Residences
B) Hilton Kuala Lumpur
C) Suasana Sentral
D) St. Regis Hotel
Created with That Quiz — the site for test creation and grading in math and other subjects.