A) KTM Komuter B) KLIA Ekspres C) KLIA Transit D) Rapid KL
A) KLM B) KUL C) XKL D) KLA
A) 14 April 2002 B) 14 October 2002 C) 14 April 2005 D) 14 April 2010
A) AirAsia and Firefly B) Malindo Air and Singapore Airlines C) Emirates and Qatar Airways D) Malaysia Airlines and Batik Air
A) At the rooftop level B) At the eastern end of the station C) At the western end of the station D) At the underground level
A) MRT Shah Alam Line B) MRT Kajang Line C) MRT Putrajaya Line D) MRT Circle Line
A) KTM ETS Line B) Batu Caves–Pulau Sebang Line C) Tanjung Malim–Port Klang Line D) KL Sentral–Terminal Skypark Line
A) Suspended B) Fully operational C) Under maintenance D) Newly opened
A) KL Sentral-City B) KL Sentral-Rapid C) KL Sentral-LRT D) KL Sentral-redONE
A) At the eastern end of the station B) At the western end of the station C) At the mezzanine level D) In the center of the building
A) Ipoh B) Padang Besar C) Salak Tinggi D) Subang Jaya
A) KTM ETS B) Kelana Jaya Line C) KLIA Ekspres D) KTM Intercity
A) No B) Yes C) Yes, but only for international flights D) Yes, but only for domestic flights
A) Port Klang B) Terminal Skypark C) Padang Besar D) Batu Caves
A) Non-stop luxury service B) Long-distance intercity service C) Commuter-style service with stops in between D) Freight-only service
A) A financial area B) A transportation depot C) An entertainment hub D) A residential block
A) Lot B B) Lot E C) Lot H D) Lot F
A) KL Sentral Mall B) Sentral Plaza C) Stesen Sentral D) NU Sentral
A) West B) East C) North D) South
A) 2001 B) 2008 C) 2014 D) 2020
A) 30 years B) 999 years C) 50 years D) 99 years
A) Stesen Sentral B) KL Sentral Hub C) Sentral Terminal D) NU Sentral
A) 2001 B) 2014 C) 2000 D) 2008
A) Eight B) Four C) Six D) Ten
A) Over 1 million B) Over 500,000 C) Over 50,000 D) Over 100,000
A) 546,000 B) 600,000 C) 1,200,000 D) 500,000
A) Two blocks B) Four blocks C) Three blocks D) Five blocks
A) September 2003 B) May 2005 C) March 2004 D) June 2001
A) 2004 B) 2007 C) 2006 D) 2001
A) Four towers B) Two towers C) Five towers D) Three towers
A) British Telecom B) PricewaterhouseCoopers C) General Electric D) MRCB
A) Quill Realty Sdn Bhd B) Maxis Communications C) Lembaga Tabung Haji D) United Engineers (M) Bhd
A) 26-storey B) 30-storey C) 35-storey D) 18-storey
A) 26-storey B) 18-storey C) 35-storey D) 30-storey
A) MRCB B) Lembaga Tabung Haji C) Quill Realty Sdn Bhd D) United Engineers (M) Bhd
A) Mercu UEM B) 1 Sentral Tower C) Quill 7 D) Plaza Sentral
A) PricewaterhouseCoopers B) British Telecom C) General Electric D) Malaysian Industrial Development Authority
A) Plaza Sentral B) 1 Sentral Tower C) Quill 7 D) Mercu UEM
A) September 2003 B) December 2007 C) 2006 D) June 2001
A) 30-storey B) 18-storey C) 26-storey D) Six-storey
A) 2006 B) 2001 C) 2007 D) 2003
A) Maxis Communications B) PricewaterhouseCoopers C) Malaysian Industrial Development Authority D) British Telecom
A) Exactly 40% B) Less than 25% C) More than 50% D) Exactly 75%
A) 2015 B) 2020 C) 2011 D) 2008
A) CIMB Centre B) CIMB Plaza C) Menara CIMB D) CIMB Financial Hub
A) Petronas Towers B) KL Tower C) Merdeka Square D) National Museum
A) July 2008 B) June 2011 C) July 2007 D) December 2005
A) 2007 B) 2015 C) 2008 D) 2011
A) Kuala Lumpur International Airport B) Butterworth Central Station C) Krung Thep Aphiwat Central Terminal D) Johor Bahru Sentral
A) Prasarana Integrated Development B) Malaysian Resources Corporation Berhad C) Kisho Kurokawa D) Lim Zhengyan
A) 2025 B) 2019 C) 2015 D) 2001
A) Prasarana B) Kisho Kurokawa C) MRCB D) limzhengyan
A) 1994 B) 2010 C) 2001 D) 1945
A) Jalan Bukit Bintang B) Jalan Tun Sambanthan C) Jalan Ampang D) Jalan Damansara
A) 1 kilometre B) 200 metres C) 100 metres D) 500 metres
A) Island platform B) Terminal bay C) Spanish solution D) Side platform
A) Tactile paving B) Audio announcements C) Braille maps D) Guided handrails
A) Via an underground tunnel B) By walking through Jalan Tun Sambanthan C) Via a dedicated shuttle bus D) Via a skybridge
A) It is a transfer hub only B) It is an under-construction station C) It is an intermediate station D) It is a terminus
A) A dedicated elevator B) An underground footbridge C) A city shuttle bus D) An overhead monorail
A) T851 B) 500 C) T819 D) 800
A) 2014 B) 2015 C) 2016 D) 2017
A) 55 B) 400 C) 600 D) 208
A) 38-storey B) 37-storey C) 40-storey D) 55-storey
A) 600 B) 55 C) 208 D) 400
A) 60% B) 40% C) 20% D) 50%
A) 400 B) 600 C) 1000 D) 208
A) 782 B) 641 C) 710 D) 770
A) 651 B) 641 C) 652 D) 650
A) Hilton Kuala Lumpur B) St. Regis Hotel C) The Sentral Residences D) Suasana Sentral |