  • 1. Who led the project design team for the Mike O'Callaghan–Pat Tillman Memorial Bridge?
A) HDR, Inc.
B) T.Y. Lin International
C) Sverdrup Civil, Inc.
D) The Hoover Support team
  • 2. What is the total length of the Mike O'Callaghan–Pat Tillman Memorial Bridge?
A) 1,060 feet
B) 840 feet
C) 1,900 feet
D) 900 feet
  • 3. How high above the Colorado River is the bridge roadway?
A) 840 feet
B) 1,060 feet
C) 900 feet
D) 1,900 feet
  • 4. What kind of bridge is this in terms of construction materials?
A) Concrete-and-steel composite arch
B) All-steel suspension
C) Prestressed concrete truss
D) Reinforced concrete beam
  • 5. Which of the following describes the bridge's arch?
A) Widest steel arch in the world
B) Tallest arch in the world
C) Narrowest concrete arch in the United States
D) Widest concrete arch in the Western Hemisphere
  • 6. How high is the arch above the Colorado River?
A) 900 feet
B) 1,060 feet
C) 840 feet
D) 1,900 feet
  • 7. What connects the twin arch ribs?
A) Steel cables
B) Suspension cables
C) Concrete beams
D) Steel struts
  • 8. Why was the composite design selected for the bridge?
A) To make it the tallest bridge in the world
B) To allow for a wider roadway
C) To increase the bridge length
D) For schedule and cost control
  • 9. Who referred to the bridge as 'an American triumph'?
A) USA Today
B) HDR, Inc.
C) The Hoover Support team
D) Sean Holstege
  • 10. What did USA Today call the bridge on October 18, 2010?
A) An American triumph
B) The Hoover Dam Bridge
C) America's Newest Wonder
D) The Concrete Arch Wonder
  • 11. Is the Hoover Dam visible from the roadway while driving across the bridge?
A) No
B) Only during the day
C) Yes
D) Only from the passenger side
  • 12. Where is the parking area for the bridge located?
A) On the Nevada side
B) Directly on the bridge
C) On the Arizona side
D) At the bottom of the canyon
  • 13. How do pedestrians get to the sidewalk across the bridge?
A) By stairs and disabled access ramps
B) By a tunnel
C) By an elevator
D) By a shuttle service
  • 14. How many lanes wide is the bridge?
A) Eight
B) Two
C) Four
D) Six
  • 15. What materials were used for the arch and columns?
A) Concrete
B) Aluminum
C) Timber
D) Steel
  • 16. What is the primary purpose of the Mike O'Callaghan–Pat Tillman Memorial Bridge?
A) To bypass the Hoover Dam
B) To provide a pedestrian walkway
C) To serve as a dam overflow structure
D) To connect local residential areas
  • 17. In what year did the bridge open to traffic?
A) 2010
B) 2001
C) 2005
D) 2012
  • 18. Who was Pat Tillman?
A) A Nevada state senator
B) An American football player turned soldier
C) A project lead architect
D) The bridge construction manager
  • 19. How far is the bridge located from Las Vegas?
A) Approximately 30 miles
B) Approximately 10 miles
C) Approximately 50 miles
D) Approximately 100 miles
  • 20. What is the total cost of the Hoover Dam Bypass project?
A) $500 million
B) $240 million
C) $350 million
D) $114 million
  • 21. How much did the bridge portion of the project cost?
A) $100 million
B) $240 million
C) $75 million
D) $114 million
  • 22. Which bridge is the only one higher than the O'Callaghan-Tillman bridge in the United States?
A) Golden Gate Bridge
B) Royal Gorge Bridge
C) Glen Canyon Bridge
D) New River Gorge Bridge
  • 23. The O'Callaghan-Tillman bridge holds the record for being the highest what in the U.S.?
A) Suspension bridge
B) Railroad bridge
C) Road bridge
D) Pedestrian bridge
  • 24. When did construction of the bridge itself begin?
A) March 2001
B) October 2010
C) July 2001
D) February 2005
  • 25. What was the alternative name for the route selection chosen in 2001?
A) Sugarloaf Mountain Alternative
B) Colorado River Bridge Route
C) Hoover Dam Bypass Route
D) Nevada-Arizona Link
  • 26. Which organization managed the bridge project starting in 1997?
A) Nevada Department of Transportation
B) Federal Highway Administration
C) Arizona Department of Transportation
D) Bureau of Reclamation
  • 27. What was the length of the detour for commercial trucks before the bridge was built?
A) 23 miles
B) 104 miles
C) 50 miles
D) 200 miles
  • 28. In what year did work begin on the approaches of the bridge?
A) 2004
B) 2005
C) 2006
D) 2003
  • 29. What caused a four-month delay in May 2006?
A) A permit problem regarding a concrete-batch plant
B) A shortage of steel materials
C) A flood in the Colorado River
D) A strike by construction workers
  • 30. Which construction worker died in an accident in November 2008?
A) Robert Kraemer
B) Pat Tillman
C) Sherman Jones
D) John O'Callaghan
  • 31. How many pieces make up the arches of the bridge?
A) 200 pieces
B) 89 pieces
C) 53 pieces
D) 106 pieces
  • 32. When were the twin arch spans completed?
A) August 2009
B) March 2008
C) October 2010
D) December 2009
  • 33. What was the final gap measurement between the two halves of the arch in August 2009?
A) 3/8 inch
B) 3/4 inch
C) 2 inches
D) 1 inch
  • 34. Which TV series featured the building of the bridge?
A) Extreme Engineering
B) Mega Structures
C) Modern Marvels
D) Building Giants
  • 35. In what year was the bridge given the added designation of Interstate 11?
A) 2015
B) 2020
C) 2010
D) 2018
  • 36. Who was responsible for the roadway surfacing on both approaches?
A) Obayashi Corporation
B) Las Vegas Paving Corporation
C) Vastco, Inc
D) Frehner Construction Company, Inc.
  • 37. How many concrete columns are on the Nevada side of the approach spans?
A) Four
B) Five
C) Seven
D) Two