ThatQuiz Test Library Take this test now
Berlin Hauptbahnhof - Quiz
Contributed by: Wild
  • 1. On what date was Berlin Hauptbahnhof ceremonially opened?
A) 28 May 2006
B) 26 May 2006
C) 26 May 2007
D) 28 May 2007
  • 2. Who ceremonially opened the station?
A) Wolfgang Tiefensee
B) The Mayor of Berlin
C) Angela Merkel
D) Reamonn
  • 3. From which city did the Chancellor arrive at the opening ceremony?
A) Hamburg
B) Leipzig
C) Frankfurt
D) Munich
  • 4. What was the name of the performance held after the dedication?
A) Light of Berlin
B) Symphony of Light
C) Symphony of Sound
D) Berlin Grand Opening
  • 5. Which musical groups performed at the station during the opening?
A) The Beatles and Queen
B) Rammstein and Scorpions
C) Nena and Kraftwerk
D) Reamonn and BAP
  • 6. When did Berlin Hauptbahnhof officially go into operation?
A) 28 June 2006
B) 28 May 2006
C) 1 June 2006
D) 26 May 2006
  • 7. How many people were wounded during the attack at the ceremony?
A) 33
B) 6
C) 41
D) 16
  • 8. How old was the attacker at the opening ceremony?
A) 18
B) 21
C) 15
D) 16
  • 9. How many years in prison was the attacker sentenced to?
A) Seven
B) Six
C) Ten
D) Five
  • 10. What was the attacker convicted of in 2007?
A) Terrorism
B) Aggravated assault
C) Attempted murder
D) Attempted manslaughter
  • 11. Which other stations hosted events during the opening?
A) Gesundbrunnen, Potsdamer Platz and Südkreuz
B) Friedrichstraße, Westkreuz and Spandau
C) Alexanderplatz, Zoo and Ostbahnhof
D) Leipzig, Hamburg and Munich
  • 12. Why were there concerns about infection among the stabbing victims?
A) There was fear of a biological weapon
B) The knife was rusty
C) The attacker was ill
D) One victim was HIV-positive
  • 13. What did the attacker claim regarding the crime?
A) He was paid to do it
B) He was acting in self-defense
C) He could not remember it
D) He was targeting a specific person
  • 14. What was the name of the transport plan developed after the Berlin Wall fell?
A) Stadtbahnkonzept
B) Pilzkonzept
C) Lehrter Konzept
D) Spreebogen Plan
  • 15. What does 'Pilzkonzept' translate to in English?
A) Bridge concept
B) Mushroom concept
C) Tunnel concept
D) Station concept
  • 16. In what year did the federal government decide to build the new station at the Lehrter Bahnhof site?
A) 1989
B) 1997
C) 1992
D) 1995
  • 17. How many levels did the station design call for?
A) Four
B) Five
C) Six
D) Three
  • 18. How high above street level is the bridge with the highest platforms?
A) 10 metres
B) 5 metres
C) 20 metres
D) 15 metres
  • 19. How far underground is the lowest level of the station?
A) 15 metres
B) 25 metres
C) 20 metres
D) 10 metres
  • 20. When was the planning approval for the station and the north–south connection granted?
A) 12 June 1992
B) 12 September 1995
C) 12 September 1997
D) 12 October 1993
  • 21. What was the total amount of the 1997 financing agreement?
A) €700 million
B) €500 million
C) €1 billion
D) €800 million
  • 22. What was the federal government's share of the financing agreement?
A) €700 million
B) €500 million
C) €200 million
D) €300 million
  • 23. Which company was commissioned by Bahn AG to develop the station?
A) Gerkan, Marg and Partners
B) Deutsche Bahn
C) Schlaich, Bergermann and Partner
D) Tishman Speyer Properties
  • 24. Which cancelled train technology was originally planned to have platforms at track 8?
A) Electric tram
B) Steam locomotive
C) Transrapid maglev
D) ICE high-speed train
  • 25. What U-Bahn line extension was included in the station plans?
A) U-Bahn line 9
B) U-Bahn line 7
C) U-Bahn line 2
D) U-Bahn line 5
  • 26. The new north–south line intersects which existing railway line?
A) Ringbahn
B) S-Bahn ring
C) U-Bahn line 1
D) Stadtbahn
  • 27. What kind of trains primarily used the four-track Stadtbahn station?
A) Suburban trains
B) Freight trains
C) High-speed international trains
D) Steam-powered long-distance trains
  • 28. In what year were the tracks at Lehrter Stadtbahnhof modified for the first time after its opening?
A) 1929
B) 1912
C) 1882
D) 1943
  • 29. What official designation did electrified suburban trains receive on 1 December 1930?
A) U-Bahn
B) Stadtbahn
C) Reichsbahn
D) S-Bahn
  • 30. Which group bombed the Lehrter Stadtbahnhof in April 1943?
A) Allied Air Force
B) Zagra-lin
C) BVG
D) Deutsche Reichsbahn
  • 31. After the division of Berlin, which station was the next stop heading east from Lehrter Stadtbahnhof?
A) Lehrter Bahnhof
B) Berlin Friedrichstraße
C) Bellevue
D) Hackescher Markt
  • 32. Which entity operated the West Berlin S-Bahn lines before they were transferred to the BVG?
A) BVG
B) The Allies
C) Deutsche Reichsbahn
D) The City of Berlin
  • 33. In what year was the station renovated to celebrate Berlin's 750th anniversary?
A) 1987
B) 2002
C) 1994
D) 1961
  • 34. Why was the Lehrter Stadtbahnhof demolished in 2002?
A) It was no longer structurally sound
B) It was sold to a private developer
C) It was severely damaged by fire
D) To make way for the new central station
  • 35. What status did the Lehrter Stadtbahnhof attain due to being preserved in its original condition?
A) National monument
B) UNESCO World Heritage site
C) Listed building
D) Public park
  • 36. Which city, originally separate, was one of the destinations connected by the Stadtbahn?
A) Charlottenburg
B) Köpenick
C) Potsdam
D) Spandau
  • 37. Which company owns Berlin Hauptbahnhof?
A) DB InfraGO
B) German Federal Railways
C) Deutsche Bahn AG
D) Berlin Transport Authority
  • 38. In which Berlin borough is the station located?
A) Charlottenburg
B) Moabit
C) Mitte
D) Kreuzberg
  • 39. Which railway station formerly occupied the site of Berlin Hauptbahnhof?
A) Berlin Südkreuz
B) Hamburger Bahnhof
C) Lehrter Bahnhof
D) Berlin Ostbahnhof
  • 40. What year did the original Lehrter Bahnhof open?
A) 1882
B) 1884
C) 1951
D) 1871
  • 41. Which U-Bahn line serves the tracks labeled U1 and U2 at the station?
A) U5
B) U55
C) U1
D) U2
  • 42. How many other Category 1 stations are located in Berlin besides the main station?
A) Four
B) Three
C) Five
D) Two
  • 43. What event caused a horizontal strut to crash from the station exterior in 2007?
A) Vandalism
B) Cyclone Kyrill
C) A construction accident
D) An earthquake
  • 44. What is the name of the sculpture erected at the station in 2007?
A) The Humboldthafen Monument
B) Rolling Horse
C) The Ironing Structure
D) Spreebogen Sculpture
  • 45. Which river flows to the south of Berlin Hauptbahnhof?
A) Havel
B) Oder
C) Elbe
D) Spree
  • 46. When was the Lehrter Bahnhof demolished?
A) 1957
B) 1951
C) 1945
D) 1987
  • 47. Which company built the railway between Hannover and Berlin via Lehrte?
A) Magdeburg Halberstädter railway company
B) Prussian State Railways
C) Berlin Transport Authority
D) Deutsche Bahn
  • 48. What architectural style was used for the Lehrter Bahnhof?
A) Modernist
B) Gothic Revival
C) French Neo-Renaissance
D) Art Deco
  • 49. What material replaced the originally planned stone façade to save money?
A) Wood paneling
B) Glazed tiles
C) Concrete panels
D) Red brick
  • 50. What nickname was given to Lehrter Bahnhof due to its architecture?
A) The Gateway to Berlin
B) City Station Number One
C) Palace among stations
D) The Iron Giant
  • 51. Where did most passengers enter and exit the station?
A) The main front entrance
B) The west side
C) The east side
D) The north entrance
  • 52. When did Hamburger Bahnhof close?
A) 28 August 1951
B) 14 October 1884
C) 18 August 1882
D) 19 December 1932
  • 53. What was the speed of the Fliegender Hamburger train?
A) 120 km/h
B) 200 km/h
C) 160 km/h
D) 90 km/h
  • 54. When was the Berlin-Lehrte railway nationalized?
A) 1932
B) 1871
C) 1945
D) 1886
  • 55. When was the main entrance of Lehrter Bahnhof blown up?
A) 28 August 1951
B) 9 July 1957
C) 22 April 1958
D) Summer 1959
  • 56. How high is the tower that ventilates the road tunnel?
A) 85 m
B) 45 m
C) 120 m
D) 60 m
  • 57. During which years was the course of the Spree diverted?
A) 1998–2000
B) 1996–1998
C) 2001–2003
D) 1995–1997
  • 58. In what year did the construction of the station proper begin?
A) 1995
B) 1998
C) 2005
D) 2001
  • 59. Who was one of the people who laid the foundation stone on 9 September 1998?
A) Eberhard Diepgen
B) Hani Azer
C) Meinhard von Gerkan
D) Peter Strieder
  • 60. Who was the chief construction engineer starting in 2001?
A) Wissmann
B) Hartmut Mehdorn
C) Ludewig
D) Hani Azer
  • 61. When was the main station hall glass roof installed?
A) 2005
B) September 2002
C) July 2002
D) February 2002
  • 62. What is integrated into the glass surface of the station roof?
A) A photovoltaic system
B) Advertising displays
C) Water collection systems
D) A ventilation system
Created with That Quiz — the math test generation site with resources for other subject areas.